Case study

Taking a 53-site commercial heat pump retrofit from tender to delivery in 18 weeks

Grand City Properties (GCP), a subsidiary of Aroundtown SA

53 sites delivered in 18 weeks, priced below industry average

Completed heat pump plant room at a Grand City Properties building
Client
Grand City Properties (GCP), a subsidiary of Aroundtown SA
Sites
Hamm, Werdohl, Duisburg, Zeitz, Bremerhaven — 53 sites
Usage type
Multi-family residential (Mehrfamilienhäuser)
Service
Hybrid air-to-water heat pump systems

65%

renewable energy required for any new heating system in Germany

The Challenge

Grand City Properties, one of Germany's largest residential landlords, had a portfolio of occupied Mehrfamilienhäuser with ageing gas heating systems in need of replacement.

Under Germany's Building Energy Act (GEG), any new heating system must run on at least 65% renewable energy, ruling out a straightforward like-for-like swap.

GCP needed a partner who could source and vet qualified heat pump suppliers capable of delivering a multi-city retrofit programme at scale, on time and on budget, without disrupting the tenants living in these buildings.

Our Approach

  1. 1.

    Assessment and Business Case

    To claim Germany's federal heat pump rebate, GCP needed to know exactly which system each supplier planned to install, since only certain equipment qualifies. Suppliers don't typically share that level of detail, just a price.

    We built a structured template requiring every supplier to disclose system type, performance data, and materials alongside their price. That gave GCP's board a complete picture of the upfront cost weighed against the rebate and projected energy savings.

  2. 2.

    Design and Specification

    At this scale, every building risked becoming its own bespoke project, slow to procure and hard to manage across five cities.

    We grouped the sites into five geographically focused batches of 9 to 12 properties, and ran structured site surveys so each batch produced a scope-of-works table per address and a line-item pricing template.

    Live projects

  3. 3.

    Tendering

    86%

    faster tender turnaround

    Batching also made the work commercially attractive to suppliers who wouldn't take on a single building at GCP's target price.

    We identified and vetted 12 suppliers, selecting four based on technical credentials, track record, geographic reach, and their ability to meet that price point.

    Key data

    Industry standardCQuel

    Weeks

    40

    30

    20

    10

    0

    86% faster tender turnaround

    6–8 wks

    1 wk

    45% faster

    6–9 months

    18 wks

    Tender turnaround

    Time to installation

    Industry standard shown as the midpoint of the published range (6–8 weeks tender turnaround; 6–9 months to installation). Source: Enter.de, 'Lieferzeiten Wärmepumpe 2026: Wartezeiten', enter.de, November 2025.

  4. 4.

    Delivery

    70+

    additional sites

    We're now helping GCP roll out heat pumps across an additional 70+ sites.

    As the project moves into delivery, our platform gives GCP clear, top-line visibility into when key stages are met and invoices are raised across all sites, all from a single place. Rather than GCP having to chase and rely solely on supplier updates, we proactively track progress and invoice status, so the customer always has an accurate picture of what's happening and when.

    Outdoor heat pump unit connections on a concrete plinth

The Results

  • Time in tender

    ~1 week per batch, against a 6–8 week industry standard

  • Bid competitiveness

    12 suppliers vetted, 4 selected

  • Time to installation

    within 18 weeks — from initial supplier outreach to completed installation, vs 6–9 months typical for a programme of this kind

  • Pricing

    Winning bids came in at least 16% below the range typically charged for Mehrfamilienhaus heat pump installations in Germany*

*€2,150–€4,839/kW range. Source: Luisa Ney, “Wärmepumpe Mehrfamilienhaus: Voraussetzungen, Kosten & Arten”, Thermondo, last updated 6 August 2026. thermondo.de

Let's get it done.

Retrofit with the ease and value you need—backed by the high-touch human service you deserve.